A finished floor-standing cabinet on a workshop floor, with a steel rack holding stacked sections behind it and a press brake further back

Industry · Manufacturing & industrial

The plant floor is not a data hall. The rack can still live there.

Dust, seasonal heat, vibration and a slab that is never quite level. None of that is a reason to keep the network cabinet in the office.

  • 1000 kgStatic load, standard
  • ≥75% / ≥60%Front and rear door mesh
  • 2–3 weeksTo a closed row on site
Send us your site conditions

Site condition

What it changes in the specification

Airborne dust

Cleaning interval, cabinet position, and whether the row is enclosed.

Ambient swing

Where the supply air is taken from, and whether cooling sits inside the row.

Vibration

Load class and how the cabinet is fixed to the floor.

Uneven slab

Levelling feet, base frame, and how the row is coupled.

Forklift traffic

Clearance to the traffic lane and impact protection on the approach side.

Shared power

Reserved mounting position for the intelligent busbar and PDU, plus the earth path.

Airborne dust

Three actions

  1. 01 Position Keep the cabinet away from cutting, grinding and welding bays; put it on the clean side of the aisle.
  2. 02 Interval Mesh doors pass air and dust alike. Agree a cleaning interval and a responsible person before commissioning.
  3. 03 Enclosure Where dust is unavoidable, close the row: the mesh still passes air, but the aisle keeps the dust you cannot remove on the outside.

We do not print a protection rating on a mesh-door cabinet.

Site survey

M1 — M6

Plant-floor section: a cabinet on levelling feet, measured against its dust source, the traffic lane, the supply-air face and the overhead services Six measured points M1 to M6. Solid lines are fixed items; dashed lines are optional or to be decided. Cable tray and pipework zone M5 headroom to trays and pipework Cabinet M6 entry from above M6 entry from below M1 slab and levelling feet M2 supply-air face height Grinding and welding bay M4 distance to the dust source Traffic lane M3 clearance to the traffic lane
Solid lines are fixed; dashed lines are optional or still to be decided.

M1 slab and levelling feet · M2 supply-air face height · M3 clearance to the traffic lane · M4 distance to the dust source · M5 headroom to trays and pipework · M6 cable entry from above or below

Ambient swing

Air handling

  1. 01 Take supply air low.
  2. 02 Do not take supply air from above a hot machine.
  3. 03 Close the row when the room temperature is not yours to control.
  4. 04 Measure at the front of the rack, not at the wall.
25%+

Energy saving — sealed row against a conventional open layout

2–3weeks

Closed row on site, from survey to commissioning

7pages

Cold aisle containment test report

No room to build

Single-row unit

IT space
27U
Footprint
0.72 m²
Install
3 hours
  • Built-in UPS
  • PDU
  • Precision air conditioning
  • DCIM
  • Smoke-sensor interlock with emergency ventilation

One cabinet, one footprint on the slab, no room to build. The functions above are named, not pictured.

One single-row intelligent cabinet standing on a concrete floor as if newly set down, blue LED strips down both front edges
The same single-row cabinet, set down on the slab

Shared power

Distribution and earth

  • Power distribution cabinet — reserved mounting position for intelligent busbar and PDU
  • Grounding — front door, rear door and frame bonded at multiple points
  • After any floor work — re-check the bond from the row to the building earth

Next to a welding bay, the earth path is not a formality.

A distribution cabinet in place on a factory floor with its door open, breaker rows stacked behind and a cable tray rising from the top
Distribution cabinet on the plant floor, tray rising from the top

Shutdown window

Two tracks

Track A — closed row

Survey frame and cabinets roof panels and doors commissioning

2–3 weeks

Track B — single-row unit

Delivered assembled positioned, connected, live

3 hours on site

Plan the work in your shutdown window; the row is pre-assembled, not built around your machines.

Partner equipment where quoted: Manufactured by Envicool — not by ems-rack. Manufactured by Bainard — not by ems-rack.

Partner brands

Next step

Send the floor plan, the dust source and the shutdown window

Send us the floor plan, the dust source and the shutdown window. We answer with a specification sheet and a drawing set.

Every request is either accepted or explicitly refused — never silently dropped.

Related: Power distribution cabinets · Cold aisle containment · Airflow and cooling