Skip to content
Start a request
Menu

Industry · Finance & banking

Bring your acceptance standard. We will answer with the report.

A finance review does not ask what a cabinet looks like. It asks for the seismic report, two power positions and the document that proves the unit was checked. All three exist, and all three are on this page.

CAICT seismic test report · 18 pages

Send your acceptance standard

Three things a review asks before it reads anything else

01

Seismic

A third-party rack seismic report is asked for before anything else.

CAICT rack seismic test report, 18 pages — open to page-by-page inspection below.

02

Power

Two ways in, and somewhere inside the row to land them.

Mounting positions reserved for intelligent busway / PDU, per cabinet. Precision column head cabinet as an option.

03

Audit trail

Paper that can still be produced three years after handover.

Full inspection before shipment with a certificate per unit; key quality data kept for the product lifecycle.

The lines a review asks for

Sorted the way a review asks
Acceptance area What we can put against it
SeismicThird-party rack seismic test report, CAICT, 18 pages
Structural loadThird-party static-load test report, 3 pages
ContainmentThird-party cold aisle containment test report, 4 pages
Power positionsMounting positions reserved for intelligent busway / PDU, per cabinet
Power distribution optionPrecision column head cabinet
GroundingFront door, rear door and frame — multiple points
Rack height42U = 2000 mm · 47U = 2200 mm; other heights built to order
Width × depth600×1000 · 600×1100 · 600×1200 · 800×1200 mm
Steel and gaugesBaosteel / Ansteel SPCC cold-rolled; 2.0 mm uprights · 1.2 mm doors
Static load1,000 kg standard · 1,500 kg on reinforced-frame models
Unit documentationFull inspection before shipment, with a certificate per unit
Records retentionKey quality data kept for the product lifecycle
Structural warranty5 years on the rack frame

Solution

Two ways in, and a trail that outlives the handover

Where the power lands

  • Mounting positions reserved for intelligent busway / PDU, per cabinet
  • Precision column head cabinet drawn to sit against the row
  • Front door, rear door and frame bonded at multiple points

Where the record lands

  • Every unit inspected in full before shipment, with its own certificate
  • Key quality data kept for the product lifecycle
  • Cabinet-side monitoring data is recorded on the platform side. No screen is drawn on this page.

UPS units in these packages: Manufactured by Bainard — not by ems-rack.

A dark precision column-header distribution cabinet with its door open, rows of miniature breakers stacked behind
Precision column head cabinet, door open on the breaker rows
Close detail of a server cabinet frame: the lower hinge stile with the door open, the bare-metal grounding stud and its star washer beside it
Bonding stud on the frame upright, beside the door hinge

Evidence

The 18 pages, group by group

  1. Cover

    Cover and commission details

    The issuing laboratory, the commissioning party and the cabinet model under test.

  2. P-01 → P-07

    The conclusion, the equipment as tested and the frequency curves

    The pass verdict, the cabinet as configured and mounted, and the natural-frequency curves from the two runs.

  3. P-08 → P-17

    Spectra, measured frequencies and item-by-item verdicts

    Measured values for each item, with the verdict written against each one.

  4. P-18

    Test conditions and personnel

    The closing page of the report: the test conditions and the test personnel, marked as the last page.

    The report read page by page

An equipment hall with two contained cabinet rows running parallel and their glass end doors closed
Two contained rows in service, aisles kept clear

Project record

New China Life Insurance data centre

Rack rows, containment and the power positions, delivered into a room whose systems are reviewed by the client's own finance-side acceptance process.

Scope
Cabinet rows, cold aisle containment, reserved busway and PDU positions
Acceptance
Cleared the client's own review at the first submission
Monitoring
Data collected across the row; faults raised before an operator found them by hand

Next step

Send the standard, we send the file.

Send the acceptance standard your review uses. We answer with the document that covers each line — and say plainly where a document does not exist.

Every request is either accepted or explicitly refused — never silently dropped.

Related: Seismic and load · Power distribution · Server racks · Quality and certificates