FACTORY · SHIJIAZHUANG, HEBEI
One workshop, from coil steel to a coated cabinet.
Cutting, forming, welding and a 7-stage coating line under one roof — 8,000 m² total facility (6,000 m² production workshop).
- SiteOne, Shijiazhuang, Hebei
- Workshop6,000 m² production workshop
- LineCNC press brake · robotic welding · 7-stage coating
Seven steps, in order
-
01
Blank
Coil and sheet steel cut to size.
-
02
Punch
CNC turret punch.
-
03
Form
CNC press brake.
-
04
Weld
Robotic welding with manual touch-up.
-
05
Pre-treat
Degreasing, rinse, phosphating, rinse, drying.
-
06
Coat
Electrostatic powder coating.
-
07
Cure
Oven curing.
Uprights 2.0 mm · doors 1.2 mm · front mesh ≥75% · rear mesh ≥60%
Three stages, in detail
-
Forming
CNC press brake. ±0.5 mm on formed parts.
-
Welding
Robotic welding with manual touch-up.
-
Coating
Seven-stage line: degreasing, rinse, phosphating, rinse, drying, electrostatic powder coating, curing.
Steel arrives inspected, not assumed.
Cold-rolled SPCC steel from Baosteel and Ansteel is checked on arrival before it enters the line.
Uprights are 2.0 mm, doors and side panels 1.2 mm.
Incoming steel · 100% inspection, certificate retained per batch
Incoming steel and formed parts staged beside the press brake.
Control points on the line
- 01Incoming steel100% inspection on arrival
- 02First pieceChecked before the batch runs
- 03In processFormed dimensions checked against drawing
- 04Pre-coatSurface cleaned and phosphated before powder
- 05Final100% visual, key dimensions sampled, 100% grounding continuity
Every cabinet leaves with a test record.
What comes off this line gets tested
-
CAICT seismic test report
-
Load test report
-
Cold aisle containment test report
Scan reproductions are original documents; captions are in English. Quality and certificates
Bring a drawing. Walk the line.
Tell us the part and the volume you have in mind, and we will walk you through forming and coating against it. Requests are accepted or explicitly refused — never left unanswered.