Skip to content
Start a request
Menu

FACTORY · SHIJIAZHUANG, HEBEI

One workshop, from coil steel to a coated cabinet.

Cutting, forming, welding and a 7-stage coating line under one roof — 8,000 m² total facility (6,000 m² production workshop).

  • SiteOne, Shijiazhuang, Hebei
  • Workshop6,000 m² production workshop
  • LineCNC press brake · robotic welding · 7-stage coating

Book a production audit

The machine row in the production workshop: the nearest CNC press brake with a formed panel on its bed, further machines receding toward the roof structure
Production workshop — CNC press brake forming cabinet panels.

Seven steps, in order

  1. 01

    Blank

    Coil and sheet steel cut to size.

    Guillotine shear

  2. 02

    Punch

    CNC turret punch.

    100% incoming steel inspection (Baosteel / Ansteel SPCC)

  3. 03

    Form

    CNC press brake.

    ±0.5 mm dimensional accuracy on formed parts

  4. 04

    Weld

    Robotic welding with manual touch-up.

    No missed or porous welds

  5. 05

    Pre-treat

    Degreasing, rinse, phosphating, rinse, drying.

    Phosphate layer before powder

  6. 06

    Coat

    Electrostatic powder coating.

    Dry film 80–120 μm

  7. 07

    Cure

    Oven curing.

    Adhesion class 1 (GB/T 9286—2021)

Uprights 2.0 mm · doors 1.2 mm · front mesh ≥75% · rear mesh ≥60%

Three stages, in detail

  • Bending die at the moment of the stroke: the punch descending into the die with a cold-rolled steel sheet bending up from both sides of the tooling

    Forming

    CNC press brake. ±0.5 mm on formed parts.

    Uprights 2.0 mm, doors 1.2 mm, SPCC cold-rolled steel.

  • A cabinet base frame clamped square on a steel jig with one continuous weld bead running along the corner joint

    Welding

    Robotic welding with manual touch-up.

    Welds are inspected for missed and porous joints before coating.

  • The coating area: a powder spray booth with a suspended conveyor rail carrying freshly coated panels on hooks, an oven mouth behind

    Coating

    Seven-stage line: degreasing, rinse, phosphating, rinse, drying, electrostatic powder coating, curing.

    Dry film 80–120 μm; adhesion class 1.

Stacks of bare cold-rolled steel sheet and bundles of extruded section staged on the workshop floor in the foreground, the base of the press brake soft in the background

Steel arrives inspected, not assumed.

Cold-rolled SPCC steel from Baosteel and Ansteel is checked on arrival before it enters the line.

Uprights are 2.0 mm, doors and side panels 1.2 mm.

Incoming steel · 100% inspection, certificate retained per batch

Incoming steel and formed parts staged beside the press brake.

Control points on the line

  1. 01Incoming steel100% inspection on arrival
  2. 02First pieceChecked before the batch runs
  3. 03In processFormed dimensions checked against drawing
  4. 04Pre-coatSurface cleaned and phosphated before powder
  5. 05Final100% visual, key dimensions sampled, 100% grounding continuity

Every cabinet leaves with a test record.

What comes off this line gets tested

  • Cover page of the CAICT seismic test report for the cabinet

    CAICT seismic test report

    18 pages · reproduced page by page on the quality page.

  • Cover of the third-party load test report

    Load test report

    3 pages — the document behind the 1,500 kg figure on reinforced-frame models.

  • Cover of the cold aisle containment test report

    Cold aisle containment test report

    4 pages · test data on the enclosed aisle.

Scan reproductions are original documents; captions are in English. Quality and certificates

Bring a drawing. Walk the line.

Tell us the part and the volume you have in mind, and we will walk you through forming and coating against it. Requests are accepted or explicitly refused — never left unanswered.

Book a production audit